| Click on the photo for a larger view. |
 |
 |
| Preparing the ground for the foundation. |
Library footing work. |
 |
 |
| New parking lot and sidewalk construction on the north side of City Hall. |
 |
 |
| Preparing for the walls. |
 |
 |
| As the walls are being framed, the new library begins to take shape. |
 |
 |
| Looking at the Library's north entrance. |
 |
 |
| Second floor concrete pour and finishing. |
 |
 |
| The east side of the building facing Main Street. |
 |
 |
| Views of the beautiful woodwork inside the building. |
 |
 |
| The long awaited parking lot! |
 |
 |
| The finished interior and woodwork. |
 |
 |
| Laying down of sod. |
The new main Library entrance facing S.W. 8th. |